VertaseFLI Limited
Number One
Middle Bridge Business Park
Bristol Road, Portishead
Bristol
BS20 6PN
Registered England & Wales No: 3944198
PLATFORM SHEFFIELD S.A.R.L.
SHEFFIELD
£870,000
38 WEEKS
BREAKING OUT AND CRUSHING HARDSTANDING. LNAPL RECOVERY AND DISPOSAL. EXCAVATION OF BELOW GROUND STRUCTURES, OBSTRUCTIONS, AND CONTAMINATED AREAS. REINSTATEMENT OF EXCAVATED AREAS ACROSS SITE WITH VALIDATED SITE WON MATERIALS. STABILISATION AND REINSTATEMENT OF METALS IMPACTED MATERIALS. USE OF WATER TREATMENT PLANT, WHICH RECOVERED 150 LITRES OF FREE PRODUCT. JAPANESE KNOTWEED TREATMENT AND REMOVAL. RIVER WALL DEMOLITION AND REBUILDING.
VertaseFLI was appointed by Platform Sheffield S.A.R.L to carry out land remediation and reinstatement earthworks to create carefully designed development platforms for a residential development.
The site has a long industrial past most notably as a cutlery and steel works, after which the buildings were demolished and the site was used as a car park.
Number One
Middle Bridge Business Park
Bristol Road, Portishead
Bristol
BS20 6PN